Aseer–Jazan Highway — 136 km DBFOM concession
| Clause | Obligation | Category | ||
|---|---|---|---|---|
ITB 5.3 | Consortium composition — lead member shareholdingA2 | Legal | Legal | - |
ITB 7.2 | Bid bond — unconditional bank guaranteeA2 | Commercial | Finance | 03 Aug 2026 |
ITB 7.4 | Bid bond validity period | Commercial | Finance | 30 Jan 2027 |
ITB 11.3 | Proposal validity — 180 days | Submission | Bid Management | 30 Jan 2027 |
ITB 13.2 | Two-envelope submission | Submission | Bid Management | 03 Aug 2026 |
ITB 14.1 | Proposal submission deadlineA4 | Submission | Bid Management | 03 Aug 2026 |
ITB 18.1 | Clarification request deadline | Submission | Bid Management | 06 Jul 2026 |
ITB 21.1 | Local content — minimum threshold and certificateA4 | Local content | Local Content | 03 Aug 2026 |
ITB 9.4 | Alternative technical proposal | Submission | Bid Management | 03 Aug 2026 |
ITB 24.2 | Proposal language and governing text | Legal | Legal | - |
ITB 26.1 | Evaluation weighting — technical and financial | Submission | Bid Management | - |
ITB 26.3 | Technical scoring criteria and weights | Technical | Highway Design | - |
ITB 27.2 | Financial evaluation — net present value of the payment stream | Financial | Finance / Modelling | - |
PA 6.1 | Financial close longstop | Financial | Finance | 30 Nov 2027 |
PA 9.3 | Ground conditions and slope stability risk | Legal | Tunnel Engineering | 03 Aug 2026 |
PA 12.5 | Change in law | Legal | Legal | - |
PA 18.2 | Handback condition at expiry | Technical | O&M | - |
PA 22.4 | Termination for construction milestone failure | Legal | Legal | - |
PA 27.1 | HSE — safety performance and notifiable events | HSE | HSE | - |
OS 3.4 | Geometric design — design speed and sustained gradientA4 | Technical | Highway Design | - |
OS 5.7 | Runaway vehicle escape rampsA4 | Technical | Highway Design | - |
OS 9.2 | Tunnel life safety — egress and ventilationA4 | Technical | Tunnel Engineering | - |
OS 12.6 | Bridge design — seismic and wadi flood hydrology | Technical | Structures | - |
OS 15.3 | Environmental constraints — blasting and protected areas | HSE | Environment | - |
PM 4.2 | Monthly availability charge and indexation | Financial | Finance / Modelling | - |
PM 5.1 | Unavailability and performance deductions | Financial | Finance / Modelling | - |
FM Form 9 | Parent company guarantee — unamended form | Legal | Legal | 03 Aug 2026 |